SEC Filings

10-K
NRG ENERGY, INC. filed this Form 10-K on 02/29/2016
Entire Document
 
                

The table below summarizes the status of NRG's coal fleet with respect to air quality controls. Planned investments are either in construction or budgeted in the existing capital expenditures budget. Changes to regulations could result in changes to planned installation dates. NRG uses an integrated approach to fuels, controls and emissions markets to meet environmental standards.
 
 
 
 
SO2
 
NOx
 
Mercury
 
Particulate
Units (a)
 
State
 
Control Equipment
 
Install Date
 
Control Equipment
 
Install Date
 
Control Equipment
 
Install Date
 
Control Equipment
 
Install Date
Avon 9
 
OH
 
DSI
 
2016
 
LNBOFA
 
2004
 
ACI/ESP
 
2016
 
ESP/upgrade
 
1970/2016
Big Cajun II 1
 
LA
 
DSI
 
2015
 
LNBOFA/ SNCR
 
2005/2014
 
ACI
 
2015
 
ESP/upgrade
 
1981/2015
Big Cajun II 2
 
LA
 
Gas Conversion
 
2015
 
LNBOFA/ SNCR
 
2004/2014
 
Gas Conversion
 
2015
 
Gas Conversion
 
2015
Big Cajun II 3
 
LA
 
PAL
 
2013
 
LNBOFA/ SNCR
 
2002/2014
 
ACI
 
2015
 
ESP/upgrade
 
1983/2015
Chalk Point 1
 
MD
 
FGD
 
2009
 
SCR
 
2008
 
FGD/ESP
 
2009
 
ESP/upgrade
 
1964/1980
Chalk Point 2
 
MD
 
FGD
 
2009
 
SACR
 
2006
 
FGD/ESP
 
2009
 
ESP/upgrade
 
1964/1980
Cheswick 1
 
PA
 
FGD
 
2010
 
SCR
 
2003
 
FGD/ESP
 
2010
 
ESP
 
1970
Conemaugh 1-2
 
PA
 
FGD
 
1994, 95
 
SCR
 
2014
 
FGD/ESP/SCR
 
1994,95/
2014
 
ESP
 
1970, 1971
Dickerson 1-3
 
MD
 
FGD
 
2009
 
SNCR
 
2009
 
FGD/FF
 
2009
 
ESP/FF
 
1959,1960,
1962/2003
Huntley 67-68
 
NY
 
DSI/FF
 
2009
 
LNBOFA/SNCR
 
1995/2009
 
ACI
 
2009
 
FF
 
2009
Indian River 4
 
DE
 
CDS
 
2011
 
LNBOFA/SCR
 
1999/2011
 
ACI
 
2008
 
ESP/FF
 
1980/2011
Joliet 6
 
IL
 
Gas Conversion
 
2016
 
OFA/SNCR
 
2000/2012
 
Gas Conversion
 
2016
 
Gas Conversion
 
2016
Joliet 7,8
 
IL
 
Gas Conversion
 
2016
 
LNBOFA/SNCR
 
2000,01/
2012
 
Gas Conversion
 
2016
 
Gas Conversion
 
2016
Keystone 1-2
 
PA
 
FGD
 
2009
 
SCR
 
2003
 
FGD/ESP/SCR
 
2003
 
ESP
 
1967, 1968
Limestone 1-2
 
TX
 
FGD
 
1985-86
 
LNBOFA/ SNCR
 
2002/2022,2023
 
ACI
 
2015
 
ESP
 
1985-1986
Morgantown 1-2
 
MD
 
FGD
 
2009
 
SCR
 
2007-2008
 
FGD/ESP
 
2009
 
ESP
 
1970, 1971
Powerton 5
 
IL
 
DSI
 
2016
 
OFA/SNCR
 
2003/2012
 
ACI
 
2009
 
ESP/upgrade
 
1973/2016
Powerton 6
 
IL
 
DSI
 
2014
 
OFA/SNCR
 
2002/2012
 
ACI
 
2009
 
ESP/upgrade
 
1976/2014
W.A. Parish 5, 6, 7
 
TX
 
FF co-benefit
 
1988
 
SCR
 
2004
 
ACI
 
2015
 
FF
 
1988
W.A. Parish 8(b)
 
TX
 
FGD
 
1982
 
SCR
 
2004
 
ACI
 
2015
 
FF
 
1988
Waukegan 7
 
IL
 
DSI
 
2014
 
LNBOFA
 
2002
 
ACI
 
2008
 
ESP/upgrade
 
1958/2002, 2014
Waukegan 8
 
IL
 
DSI
 
2015
 
LNBOFA
 
1999
 
ACI
 
2008
 
ESP/upgrade
 
1962/1999, 2015
Will County 4
 
IL
 
None
 
None
 
LNBOFA/SNCR
 
1999,2001/
2012
 
ACI
 
2009
 
ESP/upgrade
 
1963,72/
2000
(a) NRG plans to add natural gas capabilities at its New Castle, Shawville, and Joliet facilities in 2016,
(b) Unit expected to be converted into a cogeneration facility to provide power and steam to the Petra Nova CCF.
ACI -  Activated Carbon Injection
CDS - Circulating Dry Scrubber
DSI - Dry Sorbent Injection with Trona
ESP - Electrostatic Precipitator
FGD - Flue Gas Desulfurization (wet)
FF- Fabric Filter
FBL - Fluidized Bed Limestone Injection
LNBOFA - Low NOx Burner with Overfire Air
PAL - Plantwide Applicability Limit
SCR - Selective Catalytic Reduction
SACR - Selective Auto-Catalytic Reduction
SNCR - Selective Non-Catalytic Reduction

95